dc.contributor.author | Barham, Richard | |
dc.coverage.spatial | North Wales coast | en_US |
dc.date.accessioned | 2022-05-23T06:23:03Z | |
dc.date.available | 2022-05-23T06:23:03Z | |
dc.date.issued | 2017 | |
dc.identifier.citation | Barham, R. (2017) App D13.09 - Underwater noise baseline and modelling (Revision 1.0). Bishops Waltham, UK, Subacoustech Environmental Ltd, 46pp. DOI: http://dx.doi.org/10.25607/OBP-1751 | en_US |
dc.identifier.uri | https://repository.oceanbestpractices.org/handle/11329/1929 | |
dc.identifier.uri | http://dx.doi.org/10.25607/OBP-1751 | |
dc.description.abstract | Horizon Nuclear Power (Horizon) intends to submit a separate Development Consent Order (DCO) and
Marine Licence application for a new Nuclear Power Station on land adjacent to the Existing Power
Station. The proposed development site is located on the Wylfa peninsula, extending into the Irish Sea
between the bays of Cemlyn and Cemaes, on the northern tip of the Isle of Anglesey off the north Wales
coast. An Environmental Statement is being prepared to accompany the application.
Subacoustech Environmental (Subacoustech) has undertaken underwater noise modelling in order to
assess the possible noise impacts to marine fauna resulting from the various activities planned during
construction at the Wylfa Newydd Power Station. Marine construction activities include rock breaking
and dredging to enable vessels to reach the site as well as piling and drilling in order to construct
cofferdams and construction of breakwaters. The results of the modelling have been presented in terms
of biologically significant metrics and criteria. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Subacoustech Environmental Ltd | en_US |
dc.relation.ispartofseries | Subacoustech Environmental Report;E522R070 | |
dc.subject.other | Noise pollution | en_US |
dc.subject.other | Noise effects | en_US |
dc.subject.other | Underwater noise | en_US |
dc.title | App D13.09 - Underwater noise baseline and modelling (Revision 1.0). | en_US |
dc.type | Report | en_US |
dc.description.status | Published | en_US |
dc.format.pages | 46pp. | en_US |
dc.description.notes | Published in: Wylfa Newydd Project 6.4.91 ES Volume D - WNDA Development App D13-9 - Underwater Noise Baseline
and Modelling. PINS Reference Number: EN010007
Application Reference Number: 6.4.91; June 2018; Revision 1.0 ; Regulation Number: 5(2)(a)
Planning Act 2008; Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 | en_US |
dc.publisher.place | Bishops Waltham, UK | en_US |
dc.subject.parameterDiscipline | Human activity | en_US |
dc.subject.parameterDiscipline | Construction and structures | en_US |
dc.description.currentstatus | Current | en_US |
dc.description.sdg | 14.a | en_US |
dc.description.maturitylevel | Mature | en_US |
dc.description.methodologyType | Specification of criteria | en_US |
dc.description.methodologyType | Reports with methodological relevance | en_US |
obps.contact.contactname | Richard Barham | |
obps.contact.contactemail | richard.barham@subacoustech.com | |
obps.resourceurl.publisher | www.subacoustec.com | |